Sugarloaf Parkway currently operates with acceptable vehicle delays at Meadow Church Road and with unacceptable delays at Satellite Boulevard. Future background growth in the area and the construction of the mixed-use development planned at the Infinite Energy Center are expected to create unacceptable delays at Meadow Church Road and to further deteriorate operations at Satellite Boulevard.

The Sugarloaf CID has studied multiple options to improve Sugarloaf Parkway, including innovative intersection designs. After performing a detailed cost benefit analysis, the CID, in partnership with Gwinnett County DOT, is working to determine the most viable solution for improving this corridor between Satellite Boulevard and Meadow Church Road.